TFA designed a brand new oil terminal incorporating the restoration of two old existing and rusting 26ML Orica naptha storage tanks on Kooragang Island, including a two bay road tanker gantry and dock line to three wharves.
Project Scope:
- Refurbishment of Two 26ML Storage Tanks
- Internal Heating Coils
- Two new 400kL storage tanks
- Radar Tank Gauging
- New Bottom Loading Two Bay TTFS
- Terminal Automation
- 10 New Pumps & Piping
- Pumpsmart pump control
|
- New 1500m x 400NB Dock line
- Pigging Stations & Pig Switches
- New concrete tank bund
- Site Pavements
- Oily Water Interceptor
- Automatic entry gates
- New Main Switchboard
- Fire pumps and hydrant ring main
|
TfA Role:
- Project Management
- Facilitation of Approvals
- Functional Specification
- Cost Estimate
- Detailed Design
- Equipment & Instrument Data Sheets
- PLC Logic
- Construction management support
|
- P&ID’s
- Hydraulic pipe flow modelling
- Pump specification and sizing
- Piping Isometrics
- Bulk Earthworks
- Civil and Structural design
- Mechanical Design
- Fire fighting design
- Electrical & Instrumentation design
|