TFA was involved in the approvals, design, construction assistance and project management of four (4) x 1000m pipelines for transfer between a brownfield and greenfield storage terminals in Pinkenba, Qld. The pipeline corridor is located in loose marine soils with a high water table.
Project Scope:
· 4 x 300NB 1km piggable pipelines
· 80 m tunnel bore road crossing with 2100mm diameter concrete jacking pipe · 4 x DN100 and 1 x 110OD HDPE Sewer Main spanning the 1km corridor |
TfA’s Role included:
|
|